- 270mm loft insulation between joists and over joists.
- cylinder previously insulated. Insulated hot water pipes.
- gaps round windows and front door. Already have double glazing, hung heavy, lined curtains. Fixed rubber draught excluders on the front door.
- the space thermostat for 18°C.
- have slim line low-flush toilet cistern. Fixed spray insert in kitchen tap and two water butts.
Whole house ventilation system
- ventilation with heat recovery to prevent condensation in the timbers once the roof is well insulated and reduce the energy required to heat rooms.
posted by Vijay @ 10:44 PM permanent link | Post a Comment |
Post a Comment
<< Home
0 Comments:
Post a Comment
<< Home